MVP development — for funded founders

MVP development services:
one team from first screen to production

Kinetico Agency is a product design and engineering studio in Pokhara, Nepal, that builds MVPs for funded founders: the same senior team designs the product and writes the code that ships it. A scoped MVP costs $15,000–$50,000, takes 6–12 weeks, and lands in production in your own GitHub organization — TypeScript end to end. Fixed price after one scoping call.

6–12
weeks to production
$15k–50k
fixed price per MVP
0
design → dev handoffs

01 — Scope

What does Kinetico's MVP development service include?

Everything between an idea (or an approved design) and a product your users can sign into — done by one team, so nothing is lost between vendors.

01

Product design

Flows, screens, every state, and a design system engineering can build against — designed by the people who will build it.

02

Engineering

TypeScript end to end: React/Next.js frontend, NestJS backend, PostgreSQL. Auth, roles, payments, integrations, admin.

03

Ship & run

Production deployment, monitoring, documentation, and handover — in your accounts, with the bill in your name.

04

Brand & identity (when needed)

Name, mark, type and voice, if the product doesn't have one yet. Scoped separately; see Loam in our work.


02 — Price

How much does MVP development cost with Kinetico?

$15,000–$50,000, fixed after one scoping call. Which end of the band you land on is set by scope — roles × screens × integrations — not by hourly rate. Three tiers cover almost every MVP we are asked to build:

TierWeeksFixed priceWhat's in scopeWhat it proves
Lean6$15k – $22k1 user role · 6–10 screens · auth + one core workflow · 0–1 integrationWill anyone use the core loop at all?
Standard8$22k – $35k2 roles · 12–20 screens · core workflow + admin · payments or 2 integrationsWill they pay, and can you operate it?
Full10 – 12$35k – $50k3 roles · 20–30 screens · billing, notifications, reporting · 3+ integrationsCan this run as a business, not a demo?

Most funded founders land in Standard. We don't take $250k enterprise programs — that isn't what the studio is built for. What moves the number, where the money goes and what is not included are on the pricing page. For how these numbers compare with freelancers, offshore dev shops and US agencies, and where the money goes phase by phase, see how much it costs to build an MVP in 2026.


03 — Process

What is the MVP development process?

Five steps, one team, no handoff. Design runs one to two weeks ahead of engineering inside the same group of people, and you see a deployed, signed-in build every week from week two.

  1. 01 · Day 0

    Scoping call

    30 minutes. You bring the problem, the constraint, and whatever exists — a deck, a Figma file, a spreadsheet, a no-code prototype.

  2. 02 · Within 5 working days

    Written scope + fixed price

    Modules, screens, states, integrations, weeks, and one number. Nothing starts until you have this in writing.

  3. 03 · Week 1 →

    Design, one to two weeks ahead of code

    Flows, screens, every state, and a design system engineering builds against. Designed by the people who will build it, so there is nothing to hand off.

  4. 04 · Week 2 →

    Build with weekly demos

    A signed-in, deployed build every week from week two. TypeScript end to end, in your GitHub organization from the first commit.

  5. 05 · Week 6 – 12

    Ship, run, hand over

    Production deploy, monitoring, documentation, and the accounts. You own the repository, the design files, and the infrastructure.


04 — Timeline

How long does it take to build an MVP?

6 weeks for Lean, 8 for Standard, 10–12 for Full. This is a Standard 8-week build, week by week, showing what design and engineering are each doing — the overlap is the point.

WeekDesignEngineering
Week 1Scope locked; data model; core flowsRepo, CI, auth, database
Week 2Role-one screens, all statesCore object CRUD; first deployed demo
Week 3Role-two / admin screensCore workflow end to end
Week 4Payments and settings screensAdmin, roles and permissions
Week 5Empty, error and edge statesPayments or integrations wired
Week 6Design QA against the buildNotifications, settings, polish
Week 7Handover files, design system docsQA, performance, monitoring
Week 8Production deploy, docs, handover

05 — Stack

What tech stack does Kinetico use for MVPs?

Deliberately boring: TypeScript everywhere, React with Next.js, NestJS, PostgreSQL. Chosen so the next engineer you hire already knows it, and so a small team can work anywhere in the codebase.

LayerChoiceWhy
LanguageTypeScript, end to endOne language across design tokens, frontend, backend and scripts; the same people can work anywhere in the codebase.
FrontendReact with Next.jsServer rendering by default, the largest hiring pool, no lock-in.
BackendNestJSStructured, typed, testable; the boring choice that the next engineer already knows.
DatabasePostgreSQL (Drizzle ORM)Relational from day one — most MVPs that 'don't need SQL yet' need it by month three.
HostingVercel + a managed Postgres, or your cloudDeploy in your accounts, monitored, with the bill in your name.
DesignFigma + a coded design systemTokens and components live in the repo, so the design and the product cannot drift apart.

06 — Fit

Who is this MVP development service for — and who should not hire us?

A good fit

  • Founders with funding (pre-seed to Series A) who need a real product in production, not a prototype.
  • Budgets of $15k–$50k and a 6–12 week window.
  • Products where the scope is still the risk — you want a team that argues about what to build, then builds it.
  • Teams in North America, Europe or Asia-Pacific who are fine with weekly demos inside their hours and asynchronous work in between.

Not a fit — and where to go instead

  • $250k+ enterprise programs with compliance workstreams and 20-person teams — a large MVP development company is built for that; we are not.
  • You have a finished, correct specification and only need it executed — a dev shop will do it for less. See staff augmentation vs outsourcing.
  • You need engineers inside your own team under your own lead — that is staff augmentation, which we don't sell.
  • You are validating a one-screen idea — a no-code tool will answer that for under $5k.

07 — Compared

How is Kinetico different from a typical MVP development company?

Large MVP development companies such as Appinventiv or ScienceSoft run hundreds of engineers, enterprise client rosters and separate design and delivery teams. Kinetico is the opposite shape: a small senior team where the designer and the engineer are the same people, priced for founders rather than enterprises. For a like-for-like read across ten vendors, see our comparison of MVP development companies.

DimensionKineticoLarge MVP development companyFreelancer
Who designs and who buildsThe same senior peopleSeparate design and delivery teams; often separate officesUsually one skill set — a designer or a developer
Typical MVP price$15k – $50k, fixed$60k – $200k+, often time-and-materials$10k – $40k
Time to production6 – 12 weeks10 – 20 weeks8 – 16 weeks
Who you talk toThe people doing the workAn account manager and a project managerThe freelancer
Enterprise programs ($250k+, compliance, 20-person teams)No — we don't take themYes — this is what they are built forNo
Code ownershipYour GitHub org from the first commitYours by contract; check the clauseYours by contract; check the clause
Best whenThe spec is still the risk and you need one accountable teamYou need a large, compliant vendor and have the budgetThrowaway validation of one narrow idea

08 — Proof

What has Kinetico shipped?

Two production systems built end to end by this team — one our own platform, one client work — plus self-initiated studio pieces.

All work


09 — Handover

What do you get at the end of an MVP build?

Everything, in your name. There is no licence, retainer or lock-in required to keep running what we built.


10 — FAQ

MVP development — frequently asked questions

How much does MVP development cost with Kinetico?
$15,000–$50,000, fixed after one scoping call. Lean (1 role, one core workflow) is $15k–$22k over 6 weeks; Standard (2 roles, admin, payments or 2 integrations) is $22k–$35k over 8 weeks; Full (3 roles, billing, notifications, reporting) is $35k–$50k over 10–12 weeks.
How long does MVP development take?
6–12 weeks from kickoff to a product your users can sign into. Design runs one to two weeks ahead of engineering inside the same team, so there is no handoff wait, and you see working software weekly from week two.
Who owns the code and the design at the end?
You do. Kinetico works in your GitHub organization from day one; the repository, deployment accounts, design files and documentation are yours at handover, with no licence or lock-in.
Do you work with founders outside Nepal?
Yes. Kinetico is based in Pokhara, Nepal (UTC+5:45) and works with founders in North America, Europe and Asia-Pacific. Scoping, weekly demos and reviews are scheduled inside your working hours; the build runs asynchronously in between.
What happens if the scope changes during the build?
Changes that swap one thing for another of the same size are absorbed inside the fixed price. Changes that add scope are written up with their cost and weeks before any work starts, so the number only moves when you decide it should.
What do you need from me to start?
The problem you are solving, the constraint (budget and date), and whatever exists — a deck, a Figma file, a spreadsheet, a no-code prototype. One 30-minute scoping call produces a written scope and a fixed price; you decide from there.

Who wrote this, and where the numbers come from

Written by the Kinetico team. Kinetico Agency is a product design and engineering studio in Pokhara, Nepal, where the same senior team designs the product and writes the code that ships it. Prices and timelines are the studio's published engagement band ($15k–$50k, 6–12 weeks), split into the scope tiers we quote and calibrated on shipped work — Trile (payments and billing, six apps on one API) and Paradiso (hospitality booking, in production). Market comparisons are 2026 ranges published by other builders, rounded to bands.

Published 2026-08-17 · Last reviewed 2026-08-17 · Kinetico Agency, Pokhara

What to ask next


Start

Book a 30-minute scoping call

Bring the problem and the constraint. You leave with a written scope and a fixed number within five working days — and if a studio is the wrong shape for your stage, we will say so.

Prefer email? hello@kinetico.agency